Leakage measures from the outer wall

Outer wall of the building, seal construction to prevent leaking from around the window

Leakage measures from the building exterior wall

Do not have to put up with unpleasant leaking.

Leakage measures from the building exterior wallMany in Japan earthquakes, leaky easy building cracks in the outer wall will frequently.

Anyway if from the roof, or the case of a water leakage from the outer wall, repair will cost is not the owners also often do not contemplating a hard repair work occurs even only course to investigate?

But, you would be leaking more and more is left to keep and management cost will need a regular interior work to increase.

Early repair will extend the life of the building.

Leakage measures from the outer wall

In addition, the water soaked in precursor damages to structure itself of the building, I will shorten the life of the building.

In addition, it will become very thing if you if outer wall is gone also cause injury to pedestrians and peeling.

At low cost, if you want to stop the troublesome leaky.

Outer wall of the building, seal construction to prevent leaking from around the window

In the outer wall construction and investigation of repair, etc. building of leaky, who scaffold erection costs fact that expensive than construction costs can be found in Zara.

In addition, although it is not helpless anymore found a new leak in the roof after the scaffolding removed. Also give there the fact that.

In pioneer lab [aerial team], while investigating the cradling good place a rope access technology that uses a rock climbing technology pinpoint, and at the same time do the repair.

And to repair the most leaky terrible place at the beginning, it is also possible to go done the work little by little over the long period of time while watching the situation.

Benefits There are a lot of other.

● Because unnecessary long-term scaffolding installation, do not apologize for the inconvenience to residents and tenant’s.
● concerns over security due to the scaffold erection is not required.
● can be limited without flexible construction plan of the construction period
● acquisition of complicated road occupancy allowed is not required.