Tile percussion investigation

Tile full percussion investigation of buildings associated with the Building Standards Law

Tile percussion investigation

Do the tile percussion surveys and crack investigation of building outer wall

Tile percussion investigation by rope access
In the revised Building Standard Law of April 1, 2008, in the first of a regular investigation through the ’10 in special buildings, full percussion investigation of the exterior finish materials such as tiled and stone became mandatory.

Pioneer Lab [aerial team] is, we are a full percussion investigation of building outer wall.

Tile percussion survey in rope access scaffold erection is not required

Tile percussion survey in rope access scaffold erection is not required
If you do a full percussion investigation, and tighten the scaffolding erection cost large proportion in the survey cost.

[Aerial team] can make full use of rope access technology, make the consultation survey of the outer wall in buildings of any shape.
Since the scaffolding erection is not required, you can study at a low cost.

Because it does not set up a scaffolding, less burden on the building residents and visitors, also the degree of freedom of the construction period will be higher.
Without fear of crime prevention, road occupancy permit, etc. is also unnecessary.

Staff with qualifications of the architect is also responsible for the creation of deliverables.

Tile percussion survey in rope access scaffold erection is not required
IT support department of Pioneer Lab, is an expert of CAD that is doing a lecturer of CAD vocational training for many years.

Intuitively defective part can be understood, it is done to the integration also easy detailed of deliverables production of repair work.